Instructions
Choose only 1 answer per question. If there appears to be more than one correct answer, choose the best answer.
Exam Summary
0 of 20 Questions completed
Questions:
Information
You have already completed the exam before. Hence you can not start it again.
Exam is loading…
You must sign in or sign up to start the exam.
You must first complete the following:
Results
Results
0 of 20 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- Level 2 Pipeline Facility 0%
-
Thank you for completing the Level 2: Pipeline Facility Concepts Examination. Unfortunately you were not successful in obtaining the minimal pass mark of 80%.
-
Congratulations on passing the Level 2: Pipeline Facility Concepts Examination! Your credentials will be issued identifying the Level 2: Pipeline Facility Concepts. In addition, your credential will be posted on the Accredited Pipeliner Index. An email is on its way to you now confirming your results.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 20
1. Question
1 point(s)1. In arctic conditions the scope of the CSA Z662-19 would include pipelines operating with metal temperatures below -70 degrees centigrade.
-
Question 2 of 20
2. Question
1 point(s)2. In accordance with the Safety and Loss Management requirements mandated in Section 3 of the CSA Z662-19, a process for the management of resources is required. The process must include:
-
Question 3 of 20
3. Question
1 point(s)3. Which of the following elements is not excluded from the scope of the CSA Z662-19:
-
Question 4 of 20
4. Question
1 point(s)4. In the CSA Z662-19, an unplanned release of service fluid would best be defined as:
-
Question 5 of 20
5. Question
1 point(s)5. A management of change process must include:
-
Question 6 of 20
6. Question
1 point(s)6. The CSA Z662-19 recommends that integrity management programs must include a description of operating company commitment, responsibilities, quantifiable objectives, and methods for:
-
Question 7 of 20
7. Question
1 point(s)7. Under the CSA B51-19 a liquefied petroleum gas (LPG) tank:
-
Question 8 of 20
8. Question
1 point(s)8. A Designated Geographic Area (DGA) requires heightened protection because of the potential increased impact during a pipeline failure to:
-
Question 9 of 20
9. Question
1 point(s)9. When it has been determined all piping in a compressor station will be in accordance with the ASME B31.3:
-
Question 10 of 20
10. Question
1 point(s)10. Of the following materials being considered in a design, and based on the text in italics, which material would be restricted to a pressure corresponding to not more than 72% of the specified minimum yield strength of the pipe?
“The design pressure for pipe made to a standard or specification other than CSA Z245.1, API 5L, ASTM A984/A984M, ASTM A1005/A1005M, or ASTM A1024/A1024M shall not exceed the pressure corresponding to 72% of the specified minimum yield strength of the pipe.”
-
Question 11 of 20
11. Question
1 point(s)11. Materials may be removed and subsequently used in a different pipeline system:
-
Question 12 of 20
12. Question
1 point(s)12. The requirements for construction inspection activities begin:
-
Question 13 of 20
13. Question
1 point(s)13. The qualification of a Z662 WPS includes:
-
Question 14 of 20
14. Question
1 point(s)14. A pressure-testing plan shall address the safety of the public and the personnel conducting the testing. The testing plan shall also consider:
-
Question 15 of 20
15. Question
1 point(s)15. The requirement for a pressure containing pipe design to be registered and obtain a Canadian Registration Number (CRN):
-
Question 16 of 20
16. Question
1 point(s)16. Variables to be considered in the establishment of safe working pressures for maintenance on in-service pipelines shall include:
-
Question 17 of 20
17. Question
1 point(s)17. CRN number 4321.1234 was first registered in the Province of:
-
Question 18 of 20
18. Question
1 point(s)18. Annex N contains the guidelines for a Pipeline Integrity Management Program. These guidelines must be used:
-
Question 19 of 20
19. Question
1 point(s)19. Annex A contains the guidelines for a Pipeline Safety and Loss Management System. The annex requires that contractor services be performed by:
-
Question 20 of 20
20. Question
1 point(s)20. Management shall ensure that the policy for the safety and loss management system: